PROPOLAR
  • SOBRE
    • MISSÃO
    • HISTORIA
    • ORGANIZACAO E EQUIPA
    • FINANCIAMENTO
    • COLABORACOES
    • O VOO PROPOLAR
    • CONTACTOS
    • FAQ
  • ATIVIDADES
    • PROPOLAR 2022-23
    • NOTÍCIAS PROPOLAR
    • COMUNICADOS DE IMPRENSA
  • ARQUIVO
    • CAMPANHAS E PROJETOS FINALIZADOS
    • CONFERÊNCIAS POLARES
    • CONVOCATÓRIA A PROJETOS
  • MATERIAIS E DOCUMENTAÇÃO
    • DOCUMENTAÇÃO DAS CAMPANHAS >
      • DOCUMENTOS DAS CAMPANHAS
      • Tratado Antártica & Protocolo Madrid
    • INFOTECA POLAR
    • PUBLICAÇÕES >
      • RESULTADOS CIENTIFICOS
      • RELATÓRIOS PROPOLAR
    • RELATÓRIOS INTERNACIONAIS
    • NORMATIVAS POLARES
    • MULTIMÉDIA
    • EXPOSIÇÕES >
      • EXPOSIÇÃO CARTOGRÁFICA
      • EXPOSIÇÃO FOTOGRÁFICA
      • FICHAS EDUCATIVAS
  • SOBRE
    • MISSÃO
    • HISTORIA
    • ORGANIZACAO E EQUIPA
    • FINANCIAMENTO
    • COLABORACOES
    • O VOO PROPOLAR
    • CONTACTOS
    • FAQ
  • ATIVIDADES
    • PROPOLAR 2022-23
    • NOTÍCIAS PROPOLAR
    • COMUNICADOS DE IMPRENSA
  • ARQUIVO
    • CAMPANHAS E PROJETOS FINALIZADOS
    • CONFERÊNCIAS POLARES
    • CONVOCATÓRIA A PROJETOS
  • MATERIAIS E DOCUMENTAÇÃO
    • DOCUMENTAÇÃO DAS CAMPANHAS >
      • DOCUMENTOS DAS CAMPANHAS
      • Tratado Antártica & Protocolo Madrid
    • INFOTECA POLAR
    • PUBLICAÇÕES >
      • RESULTADOS CIENTIFICOS
      • RELATÓRIOS PROPOLAR
    • RELATÓRIOS INTERNACIONAIS
    • NORMATIVAS POLARES
    • MULTIMÉDIA
    • EXPOSIÇÕES >
      • EXPOSIÇÃO CARTOGRÁFICA
      • EXPOSIÇÃO FOTOGRÁFICA
      • FICHAS EDUCATIVAS

A CAMPANHA
PROPOLAR ​​2019-2020​
Novembro 2019 - Setembro 2020 

Imagem

Proj.ANTERMON_#01: field season 2020 starting

2/2/2020

0 Comentários

 
Mohammad Farzamian and John Triantafilis, Livingston Island, Antarctica
Imagem
The first ANTERMON field team to go south this season: Mohammad Farzamian (IDL/ULISBOA) and John Triantafilis (UNSW ) landed in King George Island and heading to Livingston Island by Spanish Ship BIO-Hesperides.
ANTERMON activities in 2020 are just starting, with the installation of a new A-ERT system in Livingston Island and EM and ERT surveys across the Island as well as maintenance of the A-ERT system in Deception Island, being conducted by 2 field teams.
 
- Livingston Island: Mohammad Farzamian (IDL/ULISBOA) and John Triantafilis (UNSW ) will install a new monitoring electrical resistivity meter  (A-ERT), which was built at IDL this year, in Reina Sofia site and perform EM and ERT surveys across the Island.

- Deception Island: Miguel Esteves will do the maintenance of the existing A-ERT system as well as repeating ERT surveys to compare with observations one decade ago.
Imagem
The A-ERT system built at IDL this year. A set-up with 26 electrodes and 0.5 m spacing. An explorer cases 5833B was used, casing the 4POINTLIGHT_10W instrument, solar panel-driven battery and multi-electrodes connectors during data acquisition. A timer was used this year to optimize the energy consumption by turning on the system at each six hours for ERT measurements.
0 Comentários



Deixe uma resposta.

    DIÁRIOS DE CAMPANHA
    PROPOLAR ​2019-20

    Os relatos ilustrados que publicamos nesta secção, são enviados entre Novembro de 2019 e Setembro de 2020, pelos investigadores dos 15 projetos da 9ª campanha do PROPOLAR.

    ​Carregue no botão para consultar os projetos e a campanha

    PROPOLAR
    2019-2020

    Histórico

    Setembro 2020
    Julho 2020
    Abril 2020
    Março 2020
    Fevereiro 2020
    Janeiro 2020
    Dezembro 2019
    Novembro 2019

    Projetos

    Tudo
    ADAT
    ANTERMON
    CEPH BAS_2019
    FACT
    Lichen Early Meter 2
    PERMANTAR
    PERMARSENIC
    VEGETANTAR 2
    WHY Antarctica

    Feed RSS

Com tecnologia Crie um website único com modelos personalizáveis.